Skip to main content

NTPC Notification 2020 - Vacancy of 275 Posts

Urgent Opening for 275 Engineer Post 




National Thermal Power Corporation Limited has released a notification regarding recruitment for 2020. Mainly application are invited for post of engineer . As the further detail regarding the Qualification,Age limit,Mode of Selection will be specified below .

Exam Name : National Thermal Power Corporation Limited

Total Post:275



Employment Type

Central Govt Job

Total Vacancies

275

Location

Pan India

Post

For Engineer & Chemist

Official Site

www.ntpc.co.in

Mode of Application

Online

Start Date of Application

15.07.2020

Last Date of Application

31.07.2020



Educational Criteria: 

The candidate must have pass Bachelor's Degree in Engineering ,Master's Degree or Equivalent from Recognized Board.

Salary:

Engineer : Rs 50,000 to Rs 160000
Chemist :  Rs 40,000 to Rs 140000

Selection Process:

  • Written Test 
  • Skill Test
  • Interview

Steps For Application:

  1. Firstly log into official site https://www.ntpc.co.in/
  2. Then candidate can apply through Online mode
  3. Check the eligibility Criteria as per NTPC requirements
  4. Pay the fees as specified
  5. After completing stages Click on submit Button
  6. Have a Print out with you for further proceeding


Deadline For Application:

Application should be submitted upto 31.07.2020


Official Link:

Notification Link: click here
Apply Link: click here



Urgent Opening for 3 Civil Engineer Post 






ITI Limited has released a notification regarding recruitment for 2020. Mainly application are invited for post of civil engineer . As the further detail regarding the Qualification,Age limit,Mode of Selection will be specified below .

Exam Name : ITI Limited

Total Post:3

Employment Type

Central Govt Job

Total Vacancies

3

Location

Pan India

Post

For Civil Engineer 

Official Site

https://www.itiltd.in/

Mode of Application

Online

Start Date of Application

22.07.2020

Last Date of Application

 5.08.2020


Educational Criteria: 

The candidate must have pass Bachelor's Degree in Civil Engineering or Equivalent from Recognized Board.
  1. Minimum of 65% aggregate marks for General and OBC candidates
  2. Minimum of 63% aggregate marks for SC/ST/PWD candidates. 

Experience

The candidate must have minimum experience of 2 yr in the relevant field.

Salary:

Appointments on Grade II Pay Scale on tenure basis for a period of 5 Years. [Emoluments Rs. 40787/-per month approximately (Basic + VDA + HRA) at the minimum of the Pay Scale of Rs. 8600-250-14600 [Pre-revised Scale] plus allowances and perks as per the Company’s prevailing rules] [ CTC: 6.98 Lakhs/Annum] 

Selection Process:

  • Shortlisting
  • Interview

Steps For Application:

  1. Firstly log into official site https://www.itiltd.in/
  2. Then candidate can apply through Online mode
  3. Check the eligibility Criteria as per ITI requirements
  4. Pay the fees as specified
  5. After completing stages Click on submit Button
  6. Have a Print out with you for further proceeding
  7. In order with online application candidate have to send hard copies at given address  
ADDITIONAL GENERAL MANAGER-HR (B/R&D) 
ITI LIMITED,
 BANGALORE PLANT,
 DOORVANI NAGAR, 
BENGALURU-560016 


Deadline For Application:

Application should be submitted upto 5.08.2020


Official Link:

Notification Link: Click here
Apply Link: Click here


























Comments

Popular posts from this blog

METHOD OF TUNNELING IN SOFT ROCK

A Key article to learn " Method of Tunneling in Soft Rock " providing easy access to learn     Classification of  Method of tunneling in soft rock  1)Hard rock or fully self supporting 2)Soft soils  requiring temporary support during and after construction. Forepoling Method      Sequence of operation The shaft is sunk from surface to the grade level and properly protected with timber sheeting A wooden bent properly braced is setup a few inches from sheeting Small holes at close interval are drilled through the sheeting to facilitate section being cutout.The pattern of holes are 3 inches apart above the cap and other lines of holes below the cap A peice of sheeting is cutout along the top lines of the holes Forepoles or spiles consists of planks with wedge end are entered one at a time and driven through cut,into the ground for half their lengths with an upward inclination of 2 inch per foot. After all the roof and part of side spiles are driven to half their length a timber

Previously Asked Question

Here you will get to know on which way we are going and how we will reach the destination 1. Pick up the explosive used for tunneling in soft rocks from the following :  A. Special gelatine B. Blasting gelatine C. Ammonia dynamite D. Semi-gelatine 2. Which one of the following tunnelling method is used for lying underground sewers ? A. Needle beam method B. German method  C. Army method D. English method 3. To attain the required shape of tunnel we use : A. Cutholes B. Chisels C. Erasers D. Trimmers 4. For initial surveys of tunnel, the following activities are involved :  a. Marking portal points with concrete pillars on the ground.  b. Marking tunnel obligatory points on the topograpical maps. c. Driving lines between the fixed obligatory points. d. Preliminary setting of the tunnel on the topograpical survey of Indian maps. The correct sequence of the activities are :  A. b,a,d,c B. a,b,c,d C. d,b,c,a D. c,b,d,a 5. If 'D' is a diameter of the tunnel in meters, then the thick

How to Reduce Carbon dioxide from cement?

Get an overview to learn the Basics of properties of cement and know how the carbon dioxide is being removed                          ABSTRACT Concrete is the most widely used building material in the world because of its beauty, strength, and  durability, among other benefits. Concrete is used in nearly every type of construction, including  homes, buildings, roads, bridges, airports, and subways. And in an era of increased attention to the  environmental impact of construction, concrete performs well when compared to other building  materials. As with any building product, the production of concrete and its ingredients does require energy  that in turn results in the generation of carbon dioxide, or CO2. The amount of CO2 produced during  manufacturing and the net impact of using concrete as a building material is relatively small. The  following features of concrete construction help minimize its carbon footprint. Atmospheric concentrations of CO2 are expressed in units of parts per